  • The bathroom remodel mistakes that are hardest to undo end up sealed behind tile and drywall: no waterproofing membrane, a fan that isn’t vented outdoors, pipes in a cold exterior wall and work covered before inspection.
  • Minnesota’s permit rule exempts tile, cabinets and countertops from a building permit, but plumbing, electrical and mechanical permits are still required unless otherwise exempted (Minn. R. 1300.0120). In our analysis of Minneapolis permit data, the median total fee on a bathroom-remodel building permit was $472 (2023 to October 9, 2026).
  • Electrical permits filed in Minnesota on or after Aug. 17, 2026 must meet the 2026 National Electrical Code. DLI’s checklist for it requires GFCI protection and at least one 20-amp circuit for bathroom receptacles, and keeps required receptacles out of a zone around a tub rim or shower threshold.
  • Minnesota’s Department of Labor and Industry tells homeowners to get at least three detailed bids, keep any down payment to a modest percentage of the job, and avoid contractors who offer an unusually low price or want full or substantial payment up front.

Next step

Work through every step from scope and budget to the final inspection and lien waivers, in order.

The bathroom remodel mistakes that are hardest to undo are the ones that end up sealed behind tile and drywall: skipping permits and inspections, leaving out a waterproofing membrane, venting the fan anywhere but outdoors, and running water lines in a cold exterior wall. Minnesota’s permit rule (Minn. R. 1300.0120) exempts tiling, cabinets and countertops from a building permit, but plumbing, electrical and mechanical permits are still required unless otherwise exempted. Inspectors check that work before the walls close, which is when these mistakes are cheaper to fix.

Below are 15 bathroom remodel mistakes, grouped by stage, with why each matters in a Twin Cities house and what to do instead.

Bathroom remodel mistakes at a glance

# Mistake Do this instead Cheapest time to fix
1 Choosing tile before the layout Set fixture spots and clearances first Design
2 Moving plumbing casually Price each move before you commit Design
3 One ceiling light Add light at the mirror and a rated shower light Design
4 Too little storage Plan drawers, cabinets and niches on interior walls Design
5 No blocking for grab bars Add blocking while studs are open Framing
6 No waterproofing membrane Name the system; pass the pan inspection Before tile
7 Undersized or unvented fan Duct it outdoors, insulated, under a permit Rough-in
8 Pipes in a cold exterior wall Keep supply lines in interior walls Rough-in
9 Wrong outlets or no GFCI GFCI, a 20-amp circuit, outlets clear of the tub Rough-in
10 Skipping permits Have the contractor pull them Before demolition
11 Overlooking lead paint in a pre-1978 home Check whether the firm needs EPA certification Before demolition
12 Low allowances Price your actual selections Before signing
13 Lowest bid on a different scope Three bids on one written scope Before signing
14 A big deposit Modest deposit, then pay by milestone Before signing
15 No written contract or lien waivers Signed contract, change orders, waivers Before signing

Source: Minn. R. 1300.0120; City of Blaine bathroom project page; DLI electrical inspection checklist (2026 NEC) and consumer’s guide to hiring a contractor; EPA (accessed October 2026).

Design mistakes to avoid when renovating a bathroom

1. Choosing tile before the layout

Layout decides whether the room works, so settle it before tile. Blaine’s bathroom project page lists the clearances it requires: a toilet no closer than 15 inches from its centerline to a side wall, at least 24 inches of clear space in front of toilets and vanity sinks, and a shower door with at least a 22-inch clear opening. Tile also drives labor: Castle Building & Remodeling’s 2026 cost guide says tiling an average bathroom floor and shower takes over 100 hours.

2. Moving plumbing without pricing it

Precision Tiling, an Oakdale firm that serves St. Paul and the east metro, calls keeping the plumbing in place “the single largest saving available on any bathroom,” and Castle’s FAQ puts moving a toilet at about $2,500. More than half of owner-occupied homes in Minneapolis (57%) and St. Paul (53%) were built in 1939 or earlier (Census Bureau, 2020–2024 American Community Survey), so a move can mean opening the floor, sometimes the ceiling below, and tying into old drain lines. Move a fixture only when the layout needs it, and get each move priced in writing.

3. Lighting the room with one ceiling fixture

The code minimum is low. The electrical inspection checklist from Minnesota’s Department of Labor and Industry (DLI) requires at least one wall-switched lighting outlet in a bathroom. A single overhead light can shadow your face at the mirror, so plan light at the mirror (beside or above it), general light, and a shower light if the stall is dark. Any fixture in a damp or wet spot must be marked as suitable for that location, per the same checklist.

4. Leaving too little storage

Trading a linen closet for a bigger shower, or a vanity for a pedestal sink, can leave towels and supplies with nowhere to go. Count what you store now before you design. A recessed medicine cabinet, a shower niche and a vanity with drawers add storage without taking floor space. Put recessed niches and cabinets on interior walls, because an exterior wall’s cavity is where the insulation belongs.

5. Closing the walls without blocking for grab bars

Grab bars need solid wood behind the drywall or tile, which is easy to add while the studs are open. Federal Fair Housing Act rules already require “reinforcements in bathroom walls to allow later installation of grab bars” in covered multifamily buildings first occupied after March 13, 1991 (24 CFR 100.205). Houses aren’t covered, so it’s your call. Photograph the blocking before the walls close. Our accessible bathroom guide covers related features.

Hidden-work mistakes: water, air, cold and wiring

6. Skipping the waterproofing membrane

Tile and grout are the finish. The waterproofing behind them protects the framing. Precision Tiling says a certified Schluter or Wedi system “adds a few hundred dollars in material and a day of labor to a shower,” and warns that tile set over greenboard without proper waterproofing can end in a full rebuild. Inspectors check this too. Blaine requires a shower-pan inspection for tiled showers, and a site-built pan must hold water for 24 hours in a flood test witnessed by the plumbing inspector. Get the waterproofing system named in the contract.

7. An undersized fan, or one that isn’t vented outdoors

In a Minnesota winter, warm, moist bathroom air that escapes into a cold attic or wall can condense there. Minnesota’s residential code requires an openable window or a fan vented outdoors; Blaine’s page adds that the duct be insulated for at least 3 feet from the exterior wall. In Blaine, the fan and duct need a mechanical permit and a rough-in inspection. In St. Paul, 57% of bathroom-remodel permits that list trade permits include a ventilation permit (our analysis of city permit data, 2023 through June 30, 2025, when its data ends). Size the fan to the room, end the duct at an outdoor roof or wall cap, and pick a quiet model you’ll actually run. Our exhaust fan guide covers sizing.

8. Running pipes in a cold exterior wall

Exterior walls get cold in a Twin Cities winter, and a water line inside one can freeze, especially in an older house with thin insulation. While the walls are open, keep supply lines, including the shower valve, in interior walls where you can. If a pipe has to run in an exterior wall, ask how it will be kept on the warm side of the insulation. Blaine’s remodel permit covers new insulation and vapor barrier, and its framing inspection happens before insulation goes in, so rough-in is the time to get this right.

9. Wrong outlets, no GFCI or no 20-amp circuit

Which code applies depends on when the electrical permit is filed. The Minnesota Department of Labor and Industry (DLI) says permits filed on or after Aug. 17, 2026 must comply with the 2026 National Electrical Code, and permits filed before then with the 2023 edition. DLI’s inspection checklist for the 2026 code requires:

  • GFCI protection for bathroom receptacles;
  • at least one 20-amp circuit for bathroom receptacles;
  • no required receptacle inside a zone 3 feet horizontally and 8 feet vertically from the top of a tub rim or shower threshold.

The checklist allows one exception receptacle for an electronic toilet or personal hygiene device such as an electronic bidet seat, so plan it now if you want one. If the bathroom is too small to keep the zone clear, it allows the receptacle on the farthest wall opposite the tub rim or shower threshold. Wiring must be inspected before it’s covered, and whoever covers it early pays to uncover it. The State inspects electrical work in Minneapolis, Edina, Eden Prairie, Eagan and Blaine; St. Paul, Bloomington, Plymouth, Woodbury and several other suburbs inspect their own. Under DLI’s homeowner permit, you must do the wiring yourself in a home you own and live in now, or will move into when construction is complete. Condos, two-family homes and rentals are among the excluded properties.

Permit and old-house mistakes

10. Skipping permits

Skipping permits saves little. In our analysis of Minneapolis bathroom-remodel building permits from 2023 through October 9, 2026, the median total fee was $472, with plumbing and electrical permits extra. Minneapolis requires a plumbing permit to “replace or install fixtures, like sinks, showers and tubs.” DLI’s consumer guide says the contractor should pull the permits so the contractor is responsible for meeting code, and it lists a contractor who asks the homeowner to get permits as a red flag. Our permit guide has city-by-city rules.

11. Ignoring lead paint in a pre-1978 house

In Minneapolis, 84% of owner-occupied homes were built in 1979 or earlier (the closest Census cutoff to 1978), and in St. Paul 86% were (Census Bureau, 2020–2024 ACS). Firms paid to disturb painted surfaces in pre-1978 housing generally need EPA certification. The minor-repair exemption excludes demolition of painted surfaces. See EPA coverage and exceptions. Check a company on EPA’s certified-firm search. If you do your own demolition, EPA says the rule generally doesn’t apply to homeowners working in their own home, but it still recommends lead-safe work practices. Our old-house guide covers plaster, mud-set tile and other surprises.

Money and contract mistakes

12. Accepting low allowances

An allowance is a placeholder budget for something you haven’t picked yet, such as tile or a vanity. If your choice costs more, you pay the difference, so low allowances make a quote look cheaper than it is. DLI’s consumer guide says a contract should list materials and, when possible, specify “brand names, colors, grades, styles and model numbers.” Choose your main items before signing, or ask every bidder to price the same selections. Our quote checklist shows how to read allowances.

13. Picking the lowest bid without the same scope

“Bathroom remodel” covers very different jobs. Premium Bathrooms says a refresh starts around $12,000, while Castle’s 2026 guide puts a 40 sq ft gut-to-studs remodel at $45,708–$52,678 and a 125 sq ft owner’s bath at $89,792–$103,261. A low bid may leave out demolition of mud-set tile, which Castle budgets at up to $3,000 in a hall bath, or a new valve, fan or permit. DLI recommends at least three detailed bids, says “the lowest bid may not be the best,” and lists an unusually low price as a red flag. Give every bidder the same written scope and line the bids up in our quote comparison worksheet. Check each company on the DLI license lookup. Numbers starting with “IR” are registrations, not licenses.

14. Paying a big deposit up front

DLI’s consumer guide calls a down payment customary but says it “should not be more than a modest percentage of the total job,” and it lists requiring full or substantial payment before work begins as a red flag. It adds that financially stable contractors with supplier credit don’t usually need substantial down payments for materials. Tie later payments to progress you can see, such as a passed rough-in inspection or finished tile. The guide also suggests a holdback clause, so part of the payment waits until you’ve inspected the job.

15. Skipping a written contract and lien waivers

In Minnesota, a licensed remodeler’s proposals, contracts and change orders must be in writing, signed and dated by both sides, with a detailed summary of the work, the specific materials or standard features, and the total price or how it will be calculated (Minn. Stat. 326B.809). When subcontractors or suppliers work on the job, the contract must include a pre-lien notice. It says you may pay them directly, or withhold from the contractor what they’re owed until 120 days after completion unless you get their lien waivers (Minn. Stat. 514.011). DLI advises getting partial lien waivers from any sub who sent you a pre-lien notice as you pay, and full and final waivers from every sub and supplier before the last payment. A sub’s waiver is meant to keep you from paying that sub a second time if the contractor doesn’t pay.

Which bathroom remodel regrets are hardest to fix later?

The hardest regrets to fix are the ones you can’t see once the room is finished. Mistakes 5 through 9 (blocking, waterproofing, venting, pipe routing and wiring) sit inside walls, floors and ceilings, so fixing any of them means tearing out finished tile or drywall.

Light fixtures, mirrors, paint and accessories are easy to change later, as long as the wiring and blocking are in place. Put your decision time and budget into what goes behind the walls, and save on what you can swap later.

Next steps

  1. Set the layout first using the clearances above, and decide which fixtures stay put.
  2. Write one scope and get three bids on it, and check every license. Our bathroom remodel checklist puts these steps in order.

Keep planning

Work through every step from scope and budget to the final inspection and lien waivers, in order.

Frequently asked questions

What is the biggest mistake people make in a bathroom remodel?

The hardest mistakes to fix are hidden ones: skipping the waterproofing membrane, venting the fan anywhere but outdoors, or covering plumbing and wiring before inspection. Fixing them means tearing out finished tile or drywall, while paint, mirrors and light fixtures are easy to change later.

Do I need a permit to remodel a bathroom in Minnesota?

Usually, yes. Minnesota Rules 1300.0120 exempts tile, cabinets and countertops from a building permit, but plumbing, electrical and mechanical permits are required unless otherwise exempted. Minneapolis, for example, requires a plumbing permit to replace or install sinks, showers and tubs.

How much should I pay a bathroom contractor up front in Minnesota?

The Minnesota Department of Labor and Industry’s consumer guide doesn’t name a percentage. It calls a down payment customary but says it should be a modest percentage of the total job, and it lists full or substantial payment before work begins as a red flag.

Should I add blocking for grab bars during a bathroom remodel?

It’s worth deciding while the studs are open, because adding wood blocking then is simple and adding it later means opening finished walls. Photograph where the blocking goes before drywall or tile covers it.

Does a bathroom exhaust fan have to vent outside in Minnesota?

Yes. End the duct at an outdoor roof or wall cap, never in the attic: the Department of Energy’s Building America guide rules out attics and crawlspaces. Minnesota’s residential code (R303.3) accepts windows with at least 3 sq ft of glass, half of it openable, in place of a fan; a fan used instead must exhaust directly outdoors. Blaine, for example, also requires the duct insulated for at least 3 feet from the exterior wall.

Sources

  1. Homeowner electrical permit for an existing dwelling, owner verification on page 2 (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed .
  2. Minnesota Rules 1300.0120, Permits (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  3. Minnesota Residential Code 2020, Chapter 3, Section R303 (Light, Ventilation and Heating) (opens in a new tab) — UpCodes (Minnesota Residential Code text). Accessed . R303.3 Bathrooms and exception: windows with at least 3 sq ft of glass, half of it openable, or artificial light and an exhaust system to the outdoors.
  4. Bathroom Exhaust Fans (Building America Solution Center) (opens in a new tab) — Pacific Northwest National Laboratory for the U.S. Department of Energy. Accessed . Last updated Dec. 4, 2022. Cites ASHRAE 62.2 and the 2021 IRC for the 50 cfm intermittent / 20 cfm continuous rates.
  5. Bathroom Project (opens in a new tab) — City of Blaine. Accessed . Fixture clearances, shower door opening, shower-pan inspection and 24-hour flood test, exhaust fan vented to the exterior with duct insulated 3 feet from the exterior wall, permits and inspection stages.
  6. Electrical codes and standards (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . 2026 NEC effective Aug. 17, 2026: permits filed on or after that date must comply with the 2026 NEC, permits filed before it with the 2023 NEC.
  7. Electrical inspection checklist for one-family dwellings, based on the 2026 NEC (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . Items 004–007 (homeowner wiring limits, rough-in inspection), 010 (20-amp bathroom receptacle circuit), 023 (wall-switched lighting outlet), 024 (receptacle zone near tubs and showers), 025 (GFCI), 050 (wet and damp location luminaires).
  8. Electrical Inspection Checklist for One-Family Dwellings, Based on the 2023 NEC (revised May 6, 2023) (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . Applies to electrical permits filed before Aug. 17, 2026.
  9. A consumer’s guide to hiring a residential building contractor (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . Red flags, at least three detailed bids, permits, contract contents, down payment and holdback, lien waivers.
  10. Tips for hiring a contractor (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed .
  11. Minnesota Statutes 326B.809, Written contract required (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  12. Minnesota Statutes 514.011, Pre-lien notice (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  13. Local Code Lookup (electrical inspection authority by city) (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . State (DLI) electrical inspection for Minneapolis, Edina, Eden Prairie, Eagan and Blaine; local inspection in St. Paul, Bloomington, Plymouth, Woodbury and other suburbs.
  14. License and registration lookup (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed .
  15. Bathroom Remodel Cost St. Paul MN: 2026 Price Bands (opens in a new tab) — Precision Tiling. Accessed . Page updated August 2026. Waterproofing system cost and labor; keeping plumbing in place as the largest saving.
  16. 2026 Twin Cities Remodeling Cost Guide (pp. 14, 16, 19, 21) (opens in a new tab) — Castle Building & Remodeling. Accessed . Design-build firm; prices assume pre-1960 homes and average finishes. Gut remodel and owner’s bath ranges, mud-set tile demolition line item, FAQ on moving a toilet and tile labor.
  17. Bathroom Remodel Cost in Minneapolis: 2026 Twin Cities Cost Guide (opens in a new tab) — Premium Bathrooms. Accessed .
  18. Plumbing permits (opens in a new tab) — City of Minneapolis. Accessed .
  19. CCS_Permits (building permits), data through October 9, 2026 (opens in a new tab) — City of Minneapolis. Accessed . PermitPriced analysis: total fees on bathroom-remodel building permits for 1–3 family homes, 2023 to October 9, 2026 (n = 1,433).
  20. Approved Building Permits (data ends June 30, 2025) (opens in a new tab) — City of Saint Paul. Accessed . PermitPriced analysis: share of bathroom-remodel permits listing a ventilation trade permit.
  21. 24 CFR 100.205, Design and construction requirements (opens in a new tab) — Legal Information Institute, Cornell Law School. Accessed .
  22. Lead Renovation, Repair and Painting Program Rules (opens in a new tab) — U.S. Environmental Protection Agency. Accessed .
  23. Renovation, Repair and Painting Program: Do-It-Yourselfers (opens in a new tab) — U.S. Environmental Protection Agency. Accessed .
  24. Locate Certified Renovation and Lead Dust Sampling Technician Firms (opens in a new tab) — U.S. Environmental Protection Agency. Accessed .
  25. ACS 2020–2024 5-year, table B25036 (tenure by year structure built), Minneapolis and St. Paul (opens in a new tab) — Census Reporter (U.S. Census Bureau data). Accessed . Owner-occupied homes built 1939 or earlier: Minneapolis 52,663 of 91,980 (57%); St. Paul 35,080 of 66,204 (53%). Built 1979 or earlier: 84% and 86%.

Our guides are written independently, and we don’t rank remodelers. How we research.

Free tool

Bathroom remodel cost calculator

Get a range for a full remodel or a shower or tub replacement with tiled walls. Other projects, such as replacing an acrylic or panel system on its own, get a checklist.