Planning · Checklist

Bathroom remodel checklist, step by step

Key takeaways

  • A full bathroom remodel moves through six phases: scope and budget, measurements, design decisions, hiring, construction with inspections, and closeout. Castle Building & Remodeling’s 2026 Twin Cities guide puts a complete gut at about 10–13 weeks.
  • Scope moves the price: Castle’s 2026 guide prices a 40 sq ft makeover at $25,371–$29,177 and a 40 sq ft gut to the studs at $45,708–$52,678, and puts moving a toilet at about $2,500.
  • Measure against the plumbing code before you shop. Blaine’s bathroom-project page lists at least 15 inches from a toilet’s centerline to a side wall, 24 inches of clear space in front, and 1,024 square inches of shower floor.
  • Collect the paperwork as you go: a DLI license lookup, an insurance certificate, permits, a written contract with the pre-lien notice, lien waivers before final payment, and warranty records.
  • Minnesota’s statutory home-improvement warranty starts on the day the work is completed and covers only defects caused by noncompliance with building standards. For work involving the installation of plumbing, electrical, heating or cooling systems, it runs two years against defects caused by faulty installation of those systems (Minn. Stat. 327A.02).

Next step

Describe your bathroom project and build a scope checklist to take to a contractor.

A full bathroom remodel moves through six phases: decide scope and budget, take measurements, make design decisions, hire and sign, build with inspections, and close out with final inspections, lien waivers and warranties. Castle Building & Remodeling’s 2026 Twin Cities cost guide puts a complete gut remodel at about 10–13 weeks, and most of the choices that set the price are made before demolition. This bathroom remodel checklist walks through each step in order, with the decisions to make, the measurements to take and the documents to keep.

It is meant to be printable: print the page or save it as a PDF from your browser, and check off each box as you go.

Bathroom remodel steps at a glance

Phase Finish before moving on Keep on file
1. Scope and budget Refresh, makeover or full gut; a working budget Project scope, itemized quotes, problem list
2. Measurements Room, doors, window, fixture locations A dimensioned sketch and photos
3. Design decisions Layout, shower or tub, fixtures, finishes, fan, lighting, heat, storage, blocking Selections list with model numbers
4. Hire and sign Quotes for the same scope; license and insurance checked License lookup, insurance certificate, signed contract, permits
5. Construction Rough-in and shower-pan inspections passed before walls close Change orders, photos of open walls
6. Closeout Final inspections, punch list, final payment Lien waivers, warranties, manuals

Source: PermitPriced checklist; inspection steps from City of Blaine, Bathroom Project (accessed October 2026).

Phase 1: Where to start when remodeling a bathroom

Start with scope, not tile. Castle’s 2026 guide shows how much it matters: a 40 sq ft makeover, where the shower walls come down to the studs but the floor and most walls stay, costs $25,371–$29,177. Gutting the same room to the studs costs $45,708–$52,678. Castle is a design-build firm, its prices assume pre-1960 homes and average finishes, and it notes that newer homes are typically easier and less expensive to remodel. Our bathroom remodel costs and calculator page explains why published figures vary so widely.

  • List what isn’t working: leaks, a soft floor, loose tile, mildew, poor light, no storage, an awkward layout.
  • Choose a scope: refresh (fixtures and finishes), makeover (shower area only to the studs) or full gut.
  • Decide whether any fixture moves. Castle’s hall-bath budgets assume no change to fixture locations, and its FAQ puts moving a toilet at about $2,500.
  • Note the year your house was built. Census data (ACS 2020–2024) show 84% of owner-occupied homes in Minneapolis and 86% in St. Paul were built in 1979 or earlier. For a pre-1978 house, check whether EPA lead-safe rules apply to the planned work (see Phase 4).
  • Set a working budget in the bathroom remodel cost calculator, and keep a reserve for what’s behind the walls.
  • Plan how you’ll live without the room. If it’s your only bathroom, Castle’s FAQ says there are ways to keep a working toilet through the project, but not the shower.
  • If you’ll borrow, compare options early with our financing guide.

Local note: Older Twin Cities bathrooms carry their own line items. Castle’s 5 × 8 ft hall-bath budget lists $0–$3,000 each to demolish a mud-set tile floor and wainscot, to remove and reset a radiator, and to replace a window, plus $0–$2,000 for condo or third-floor access. See our old-house bathroom guide.

Phase 2: Measurements to take before you design

Measure before you shop. Minnesota’s plumbing code is part of the State Building Code, which applies statewide and supersedes city codes (Minn. Stat. 326B.121; Minn. R. 1300.0050). Blaine’s bathroom-project page spells out the key fixture-spacing and shower minimums, which makes them a useful planning baseline elsewhere in the metro; confirm with your own city.

What to check Minimum Blaine lists
Toilet or bidet centerline to a side wall or partition 15 inches
Clear space in front of a toilet, bidet or vanity 24 inches
Shower floor 1,024 sq in finished interior, fitting a 30-inch circle up to 70 inches above the drain
Shower door opening 22 inches clear
Shower drain and piping 2 inches
Bathtub drain 1½ inches

Source: City of Blaine, Bathroom Project (accessed October 2026). Confirm with your own city’s inspector before ordering a shower base or door.

  • Room length, width and ceiling height, measured wall to wall.
  • Door width, plus the path in from outside (stairs, landings, tight turns). A new tub or shower base has to fit through.
  • Window size, its height above the floor, and whether it sits inside the shower.
  • Toilet rough-in: the distance from the finished wall to the center of the floor bolts. Note it before you pick a toilet.
  • The wall length available for a vanity, and current fixture centerlines.
  • Existing tub or shower size and drain location.
  • Which walls are exterior walls. Ask how any plumbing in them will be protected from Minnesota winters.
  • Condo owners: get the association’s remodeling rules and approval steps in writing.

Phase 3: Design decisions to make before quotes

Quotes are only comparable when each remodeler prices the same selections. Make these decisions, or agree on a written allowance for each, before you ask for bids.

  • Layout. Keep the toilet, sink and tub or shower where they are, or move them and budget for it.
  • Shower or tub. Castle’s FAQ says code doesn’t require a bathtub, but real estate agents strongly recommend keeping one in the house. Castle prices a tub-to-shower conversion with no changes outside the tub area at $30,171–$34,697. Our tub-to-shower guide compares options.
  • Shower walls. Tile or solid-surface panels. Castle says the shower surround is the biggest difference between its moderate and classic baths, and that an average floor and shower take over 100 hours to tile.
  • Fixtures. Toilet, vanity, sink, faucet, shower valve and tub. Write down model numbers. Blaine requires a single-handle tub faucet to meet the ASSE 1016 standard, and any other tub faucet to limit hot water to 120°F with an approved mixing valve.
  • Finishes. Floor tile, wall tile or wainscot, grout color, paint, trim and shower glass. Mark which are firm selections and which are allowances.
  • Ventilation. Minnesota’s residential code requires an openable window or a fan vented outdoors; Blaine’s page adds that the duct be insulated for at least 3 feet from the exterior wall. In our analysis of 454 St. Paul bathroom-remodel permits that list required trade permits (January 2023 through June 30, 2025, where the city’s open data ends), 57% list a ventilation (“W.Air Vent”) permit. See exhaust fan requirements.
  • Lighting and outlets. Vanity and ceiling lights, a shower light, outlet locations and switches. Of those same St. Paul permits (data through June 30, 2025), 81% list electrical and 99% list plumbing.
  • Heat. Keep the radiator, move it, or add a heated floor. Castle’s hall-bath budget lists $0–$3,000 for a heated floor with added lighting. See heated floor costs.
  • Storage. Medicine cabinet, shower niche, linen cabinet, hooks and towel bars.
  • Accessibility-ready blocking. Ask for wood blocking in the shower and toilet walls while they’re open, so grab bars can go in later without opening tile. Decide on a curbless shower, a wider door or a handheld shower now. Our accessible bathroom guide covers each.

Phase 4: Hire and sign: documents to collect before work starts

Ask at least three remodelers to price the scope you wrote in Phase 3. Our quote checklist lists the 12 lines every quote should cover, and the side-by-side comparison worksheet lines them up. Before you pay a deposit, collect these:

  • License lookup. A contractor you hire for two or more of Minnesota’s eight “special skills” generally needs a residential remodeler license (Minn. Stat. 326B.805). Search the DLI lookup and save a dated copy. An “IR” number is a registration, not a license.
  • Insurance certificate. Licensees must carry general liability insurance of at least $100,000 per occurrence and $300,000 aggregate for bodily injury, plus $25,000 for property damage, or a $300,000 single-limit policy (Minn. Stat. 326B.86). Ask for a current certificate.
  • Trade licenses. Who does the plumbing and electrical work, and their license numbers.
  • Lead-safe paperwork for pre-1978 homes. Firms paid to disturb painted surfaces generally need EPA certification. Check EPA coverage and exceptions and look up the firm in the EPA firm search. For covered work, the firm must give the owner EPA’s lead pamphlet within 60 days before starting. It needs the owner’s written acknowledgment or a certificate of mailing dated at least seven days before work (40 CFR 745.84).
  • Written contract. Minnesota requires it to include a detailed summary of the work, the specific materials or standard features, and the total price or how it will be calculated. Both of you sign and date it, and you get a signed copy free (Minn. Stat. 326B.809).
  • Pre-lien notice. If the remodeler uses subcontractors or suppliers, Minnesota requires this notice in the written contract (Minn. Stat. 514.011). It explains that unpaid subcontractors and suppliers can file a lien on your home.
  • Payment schedule tied to finished milestones, not dates.
  • Permits. Who pulls each one, and a copy of each.
  • Change-order process, start date and expected length.

Phase 5: During construction: permits, inspections and change orders

Every inspection is a checkpoint you can use. Blaine lists the inspections a bathroom project may need, depending on its permits: plumbing rough-in, shower pan, mechanical rough-in, framing, and plumbing, mechanical and building finals. It asks you to allow 3 to 4 business days to schedule inspections. Electrical inspection depends on your city: in Minneapolis the state Department of Labor and Industry issues and inspects electrical permits, while St. Paul does its own.

  • Permit posted before demolition starts.
  • Floors and the path to the bathroom protected; dust barriers up, with lead-safe containment in pre-1978 homes.
  • After demolition, walk the open room with the remodeler. Note what you find, such as cast-iron drains, old supply lines, wiring or rot, and get any added work priced in writing before it continues.
  • Before walls close, confirm blocking, the fan duct route, outlet locations and the niche position. Photograph every open wall.
  • Rough-in inspections passed before insulation and wall board go up.
  • Shower pan test passed before tile. In Blaine, a site-built pan is flood-tested with the drain plugged, filled to the top of the threshold and held for 24 hours, witnessed by the plumbing inspector.
  • Tile layout checked before setting: where cuts fall, niche height, grout color.
  • Every change order in writing, signed and dated by both of you (Minn. Stat. 326B.809 covers change orders too).
  • Lien waivers from any subcontractor or supplier who sent you a notice, as each is paid.

Phase 6: Final inspection, lien waivers and warranties

  • All final inspections passed: plumbing, mechanical, electrical and building. Keep the results.
  • Punch-list walk-through: caulk and grout, door swing, drains, hot-water temperature, fan running and venting outside.
  • Final lien waivers before the final payment. The contract’s pre-lien notice says you may pay subcontractors and suppliers directly and deduct it from the contract price, or hold back what they’re owed until 120 days after completion unless the remodeler gives you lien waivers from those who gave you timely notice (Minn. Stat. 514.011). A lien ends unless it is recorded, and a copy served on the owner, within 120 days after the claimant’s last work (Minn. Stat. 514.08).
  • Warranty terms in writing. Get any longer warranty the remodeler offers in writing too. Minnesota’s statutory home-improvement warranties start on the day the work is completed and cover only defects caused by noncompliance with building standards. Which one applies depends on the type of work (Minn. Stat. 327A.01, 327A.02):
    • work that installs plumbing, electrical, heating or cooling systems: two years against defects caused by faulty installation of those systems
    • work involving major structural changes or additions: one year against faulty workmanship and defective materials, and 10 years against major construction defects
    • any other home improvement work: one year against faulty workmanship or defective materials
  • Product warranties registered; manuals and model numbers saved.
  • A project file with the contract, change orders, permits, inspection results, waivers, warranties, photos of the open walls, and paint, tile and grout names. Keep a few spare tiles.

Watch out: Don’t make the final payment until the finals have passed and you hold lien waivers. The final payment is the last leverage you hold. Our list of common remodel mistakes covers more ways to protect yourself.

Next steps

Plan the schedule with our bathroom remodel timeline.

Keep planning

Describe your bathroom project and build a scope checklist to take to a contractor.

Frequently asked questions

What is the first step in remodeling a bathroom?

Decide the scope: a refresh, a makeover that keeps the floor and most walls, or a full gut. In Castle Building & Remodeling’s 2026 Twin Cities guide, that choice moves a 40 sq ft bath from $25,371–$29,177 to $45,708–$52,678. Set a working budget next, then measure.

What order do the steps of a bathroom remodel go in?

Plan, hire and pull permits first. Then comes demolition, rough-in plumbing, venting and wiring, the rough-in inspections, insulation and wall board, waterproofing with a shower-pan test for tiled showers, tile, fixtures, and final inspections. Blaine’s list of bathroom inspections starts with the plumbing and mechanical rough-ins, framing and the shower pan, and ends with the finals.

How long does a full bathroom remodel take?

Castle Building & Remodeling’s FAQ says a complete gut remodel takes about 10–13 weeks, depending on how custom it is. Tile is labor-heavy: Castle says an average bathroom floor and shower take over 100 hours of labor.

What documents should I get from a bathroom remodeler in Minnesota?

Before work starts: a written contract signed and dated by both of you, with the pre-lien notice in it, plus proof of insurance and a copy of each permit. Check the license number in the DLI lookup yourself. At the end, collect lien waivers, the final inspection results and every product warranty.

Do I need a permit to remodel a bathroom in the Twin Cities?

Usually, if plumbing, wiring or ventilation changes. Minnesota’s rules exempt finish work such as tile and cabinets from a building permit, but plumbing, electrical and mechanical permits are still required unless otherwise exempted (Minn. R. 1300.0120). In Minneapolis, replacing a sink, shower or tub needs a plumbing permit.

Sources

  1. 2026 Twin Cities Remodeling Cost Guide (pp. 14–16, 21) (opens in a new tab) — Castle Building & Remodeling. Accessed . Design-build firm; prices assume pre-1960 homes and average finishes. FAQ on p. 21.
  2. Bathroom Project (opens in a new tab) — City of Blaine. Accessed . Permits, required inspections, shower-pan flood test, ventilation and fixture-clearance minimums.
  3. Minn. Stat. 326B.121, Compliance with State Building Code (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  4. Minn. R. 1300.0050, Chapters of Minnesota State Building Code (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed . Lists chapter 4714, the Minnesota Plumbing Code, as part of the State Building Code.
  5. Minnesota Rules 1300.0120, Permits (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  6. Plumbing permits (opens in a new tab) — City of Minneapolis. Accessed .
  7. Local Code Lookup (electrical inspection authority by city) (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed . Electrical authority: State (DLI) for Minneapolis; local for St. Paul.
  8. Approved Building Permits (open data), analyzed by PermitPriced (opens in a new tab) — City of Saint Paul. Accessed . 454 bathroom-remodel permits listing required trade permits, January 2023 to June 30, 2025 (where the city’s data ends).
  9. ACS 2020–2024 5-year, table B25036 (tenure by year structure built), Minneapolis and St. Paul (opens in a new tab) — Census Reporter (U.S. Census Bureau data). Accessed .
  10. License and registration lookup (opens in a new tab) — Minnesota Department of Labor and Industry. Accessed .
  11. Minnesota Statutes 326B.805, Licensing (residential remodelers) (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  12. Minnesota Statutes 326B.86, Bond; insurance (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  13. Minnesota Statutes 326B.809, Written contract required (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  14. Minnesota Statutes 514.011, Pre-lien notice (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  15. Minn. Stat. 514.08, Statement of claim (120-day lien deadline) (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  16. Minnesota Statutes 327A.02, Statutory warranties (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  17. Minnesota Statutes 327A.01, Definitions (warranty date) (opens in a new tab) — Minnesota Office of the Revisor of Statutes. Accessed .
  18. Lead Renovation, Repair and Painting Program Rules (opens in a new tab) — U.S. Environmental Protection Agency. Accessed .
  19. 40 CFR 745.84, Information distribution requirements (opens in a new tab) — Legal Information Institute, Cornell Law School. Accessed .
  20. Locate Certified Renovation and Lead Dust Sampling Technician Firms (opens in a new tab) — U.S. Environmental Protection Agency. Accessed .

Our guides are written independently, and we don’t rank remodelers. How we research.

Free tool

Bathroom remodel cost calculator

Get a range for a full remodel or a shower or tub replacement with tiled walls. Other projects, such as replacing an acrylic or panel system on its own, get a checklist.